Renovations & Upgrades

Many of our customers already have a mineral processing plant, but wants to renovate or upgrade parts or all of it. This is one of MINPRO's specialist services. We have the experience, the machinery and the staying power to execute extensive renovation and upgrade projects. This is the most common turn of events:

Scoping Phase

This first phase deals with finding out the scope of the project, the customer's needs and expectations and MINPRO's possible solutions. Usually this involves plant visits with inspections.

Design Phase

To choose exactly the components you need for your plant and incorporating them in a flow-sheet that are both flexible and efficient is a challenge MINPRO knows how to solve. It is also very important to understand and foresee how the new facility will work with the existing machines.

Basic Engineering

When the components of your plant has been decided, a basic engineering will commence. This is performed entirely in 3D and will uncover spacial needs and challenges and give a feel for the plant as a whole. This will be the basis for contacting subcontractors with regards to getting offers for component production, construction and erection.

Detailed Engineering

This will give all the details from the structural integrity of frames and components down to the smallest bolt. MINPRO only use the most skilled and experienced CAD engineers for this work.

Component Production

Most of MINPROs components will usually be built by approved work-shops that have the finest skills in welding, CAD/CAM production and quality control. The key components for some of the machines will be built by MINPRO's own subcontractors and shipped to site.

Erection

MINPRO will work close with the company building the plant and follow up continuosly.

Final Quality Control and Inspection

Together with the customer and whomever the customer also want to use as an inspection consultant we will go through the whole plant for quality control.

Commissioning and Takeover

When all physical parameters have been checked. The process component and then process testing will continue. MINPRO is satisfied only when the customer is 100% satisfied.